Method

Efficient threestage process

Multiturn Screw Piles are engineered for simplicity. From initial footing to final structure, our three stage process delivers a strong, versatile and reusable foundation system.

Scroll to explore

Three-stage system

From initial footing to final structure.

Strong, versatile and reusable. Each stage is designed as part of one foundation system.

Screw piles installed across an active construction site
  1. Footings

    Screw piles installed across an active construction site

    Multiturn Screw Piles have a range of light to heavy duty steel shaft sizes and wall thicknesses.

    Strong enough for heavy structures

  2. Platform

    Timber platform supported on steel screw pile legs

    The steel Multiturn Helix can be married with a number of concrete platforms and leg arrangements.

    Non-permanent structure

  3. Re-use

    Screw piles stored in steel cages ready for reuse

    Multiturn Screw Piles can be easily unscrewed, removed, and economically re-used.

    Sustainable & can be re-used

Project value

Five key benefits for the builder & project manager.

  • Allows for the certification of the load capacity

  • Reduces the need and expense for load testing

  • The reduced diameter of the Multiturn helix (providing the 2x bulb factor) represents a 30% cost saving on materials compared to traditional screw pile designs

  • Minimal environmental disturbance & re-use of screw piles

  • Assurance in design — backed by the Bekker Bulb Theory